Major building licence: what you must get from the ayuntamiento before a big renovation

Municipal registry doesn't warn of errors. We deliver the proof, done right.

Municipal permit for works that affect structure, façade or otherwise change the building seriously. Use this if you’re doing a large-scale refurbishment, extending, opening openings, changing the roof or the use of a local/flat.

Start procedureGratis · sin tarjeta · guardas el progreso
Start procedureAI Assistant Talk to an agent
Fuente oficial enlazada6 steps8 documents
Plazo
4-12 semanas (más si hay patrimonio, medianeras o informes sectoriales)
Coste
Depende del ayuntamiento: ICIO (hasta el 4% del PEM) + tasa urbanística de licencia + fianza de residuos (reembolsable si procede)
Oficial
Fuente oficial

What GovEasy does

  • Prepares your case file and documentation
  • Detects frequent errors before submission
  • Saves your progress and reminds you of deadlines

What the agency does

Ayuntamiento / local

  • Receives and reviews your application
  • Issues the resolution or official document

Guía completa

What you need first
  1. Competent technician to produce the proyecto (architect and arquitecto técnico if there’s structure). Without a proper project the town hall won’t even look.
  2. Presupuesto de ejecución material (PEM) closed. ICIO and the fee come from this.
  3. Approval from the comunidad if you touch common elements or the façade. Avoid getting stopped by a hostile owners’ meeting.
  4. Signing methods: Cl@ve, certificado digital or DNIe. Most moves are via the sede electrónica now.
  5. If you’ll occupy the street with contenedor/andamio, budget time and cost. It’s a separate request.
Documentation
  1. Proyecto técnico completo (memoria, planos, pliego, mediciones y presupuesto), signed and, if required, visado by the colegio.
  2. Estudio de seguridad y salud (or basic study), and designation of the coordinator of safety.
  3. Nombramiento de dirección facultativa (director/a de obra y de ejecución).
  4. Estudio y plan de gestión de RCD and, if applicable, justificante de fianza de residuos.
  5. Plano de situación and photos of façade/interior.
  6. Autorización de la comunidad if common elements are affected.
  7. Autoliquidación del ICIO y tasa paid, with receipts.
  8. Municipal licence application (your ayuntamiento’s form).
Step-by-step
  1. Go to the sede electrónica of your ayuntamiento and identify with Cl@ve or certificado. Search “Licencia urbanística – procedimiento ordinario/obra mayor”.
  2. Fill the application with property and works data. Note the PEM and the use (vivienda, local…), because fees come from that.
  3. Calculate and pay the autoliquidación del ICIO and the urban licence fee (there’s usually a payment gateway or a payment letter). Keep the receipt (CSV or reference).
  4. Attach the project PDF, the dirección facultativa, the estudio de seguridad, the estudio de residuos and the payments. Check each PDF is electronically signed by the correct person.
  5. If you’ll place contenedor/andamio/grúa, apply for ocupación de vía pública in the same sede (separate expediente) with an implantation plan and pay its fee.
  6. Watch for subsanación: if they ask for documents, you have 10 working days to upload them. If you don’t reply, they archive and you start over.
  7. When you get the resolution, download it, display the licence sign visibly and notify start of works if your ayuntamiento requires it. If you change the project, apply for a modificación.
Tips
  1. Ask your technician for a checklist with documents and signatures. Avoid stupid subsanaciones.
  2. Compress PDFs and use clear names ("01_Memoria", "02_Planos"). Some sedes choke on 100 MB files.
  3. If the building might be protected, have your technician confirm that before you submit. Saves weeks.
  4. Many cities offer ICIO reductions for energy efficiency or accessibility. Ask before you pay.
  5. Online processing often works better in Chrome. Yes, it hurts, but some sedes fail on other browsers.
Common mistakes
  1. Mixing up obra menor and obra mayor: opening façade holes or touching structure is not minor. They can stop works and fine you.
  2. Forgetting the estudio de residuos or the fianza: they will demand it in many cities.
  3. Not paying the fee/ICIO when submitting: the file won’t start.
  4. Project without electronic signatures or without visado when required: guaranteed subsanación.
  5. Not requesting ocupación de vía pública for container or scaffold: quick fine and removal.
  6. Ignoring the 10-day subsanación: archive of the file and wasted money and time.
  1. 1.Go to the sede electrónica of your town hall and identify yourself with Cl@ve, certificado digital or DNIe (search for “Licencia urbanística – procedimiento ordinario/obra mayor”)
  2. 2.Fill in the licence application and calculate the ICIO autoliquidación and urban processing fee using the PEM of the project; pay online or at a collaborating bank and keep the proof (CSV/reference number)
  3. 3.Upload the technical project in PDF (memoria, planos, pliego, mediciones y presupuesto), appointments of the dirección facultativa, estudio de seguridad, estudio de residuos and the payment receipts
  4. 4.If you will place a container/andamio/grúa, apply on the same sede for ocupación de vía pública and pay its fee; attach implantation plan and signalling
  5. 5.Respond via the sede to any requerimiento de subsanación within 10 working days (missing documents, technical clarifications, sectorial reports)
  6. 6.Receive the licence resolution; deposit the residuos fianza if you haven’t yet and notify start of works; during works comply with conditions (licence sign visible) and apply for modifications if you change the project
  • Proyecto técnico completo (memoria, planos, pliego, mediciones y presupuesto) firmado por técnico competente y, si tu ayuntamiento lo pide, visado colegial
  • Estudio de seguridad y salud o estudio básico (RD 1627/1997), firmado por la dirección facultativa
  • Designación de dirección facultativa (director/a de obra y de ejecución) y coordinador/a de seguridad y salud
  • Estudio y plan de gestión de residuos de construcción y demolición (RCD) y justificante de constitución de fianza si tu ayuntamiento la exige
  • Plano de situación y fotografías actuales del inmueble y de la fachada
  • Autorización de la comunidad de propietarios si afecta a elementos comunes o fachada
  • Modelo municipal de solicitud de licencia urbanística cumplimentado
  • Autoliquidación y justificante de pago del ICIO y de la tasa de tramitación urbanística (modelo municipal) y, si ocupas calle, solicitud y tasa de ocupación de vía pública (contenedor, andamio, grúa)

¿Qué necesito para completar Licencia Obra Mayor sin que me lo rechacen?

Licencia Obra Mayor es gratuito en Ayuntamiento / local y se puede presentar por cuenta propia. El punto que interrumpe el trámite es que hace falta Cl@ve activa, y si no está dada de alta el registro previo puede tardar días. Además, hay que aportar 5 documentos a lo largo de 5 pasos, y la sede rechaza el envío completo si un solo dato no coincide con el que consta en el registro. GovEasy reúne y comprueba los 5 documentos antes de tocar la sede, para que el envío no se rechace por un dato descuadrado, y si no tienes la identificación digital lista, un gestor colegiado del marketplace lo presenta por ti.

  • Cl@ve activa (PIN o permanente)
  • GovEasy (extensión + gestor colegiado)
Clear guideIn 1 minute

We'll show you how to do it

A clear, jargon-free guide with the official steps and the documents you need.

Start procedure

Official information, verified and up to date.

Done by professionals

A licensed agent does it for you

Describe your case and get a no-obligation quote.

See available agents

Protected payment: the agent only gets paid as the work progresses.

Acción inmediata

Ver guía y requisitos

Necesitamos tu municipio para saber si el ayuntamiento tiene sede o patrón operativo validado por goveasy.

Your progress

50%
  1. Understand
  2. Prepare
  3. Submit
  4. Track

Your next step

1.Go to the sede electrónica of your town hall and identify yourself with Cl@ve, certificado digital or DNIe (search for “Licencia urbanística – procedimiento ordinario/obra mayor”)

  • We validate documentation before submission
  • Your progress is saved: continue any time
  • We alert you about deadlines and status changes

¿Quieres guardarlo y recibir avisos? Crea una cuenta gratis

Case file assistant

Creates the case file, prepares documents, detects risks and shows you only the next step.

Open assistant

Gestor administrativo

Para casos complejos o urgentes.

Contactar gestor

Consigue cita sin esperar

El Radar vigila 24/7 y te avisa cuando hay hueco

Deja de recargar la página. GovEasy monitoriza la sede oficial y te notifica al instante cuando se libera una cita. Gratis en tu plan.

Activar Radar de Citas

PDF gratis

Llévate este trámite en PDF

Te enviamos el checklist con documentación, pasos y enlaces oficiales para que avances sin perderte ningún detalle.Tema: Major building licence: what you must get from the ayuntamiento before a big renovation